A home built in a factory, delivered to your land with its full record.
Modular homes, delivered to your land, on the record from the first quotation to the last payment. The hardest product to move is the one we chose to prove it with.

What you are buying
Three things arrive with every Bionpact home.
The house. Built in a factory to a tolerance no site crew can match, from documented configurations with inspection records behind them. Eleven models across two systems: Apple Cabin for living, Capsule House for staying.
The delivery. Export packing, ocean freight, customs, inland haulage and the technical handoff to your local contractor — planned around your parcel before anything is built, not after it lands at the port.
The record. Every handoff signed as it happens: which line, which inspector, which date, which freight leg. You can read it. Your lender, insurer or county can read it. It cannot be edited after the fact.
Eleven models · two systems
For living, and for staying.
Apple Cabin for residences, ADUs, guest accommodation and workforce housing. Capsule House for resorts, boutique hotels and premium short-term stays, where the exterior is the brand and the view is the room.

A1 (5.6m)
- Size
- 18.4 × 7.4 × 8.0 ft
- Area
- 135.6 sq ft · 12.6 m²

A1 (11.5m)
- Size
- 37.7 × 7.4 × 8.0 ft
- Area
- 278.8 sq ft · 25.9 m²

D1
- Size
- 37.7 × 14.8 × 7.9 ft + 37.7 × 7.4 × 8.0 ft
- Area
- 836.4 sq ft · 77.7 m²

A2
- Size
- 37.7 × 9.8 × 9.8 ft
- Area
- 371.4 sq ft · 34.5 m²

A3
- Size
- 37.7 × 24.9 × 9.8 ft
- Area
- 947.2 sq ft · 88 m²

E3
- Size
- 18.4 × 10.5 × 10.5 ft
- Area
- 192.9 sq ft · 17.9 m²

E5
- Size
- 27.9 × 10.5 × 10.5 ft
- Area
- 292.8 sq ft · 27.2 m²

E6
- Size
- 27.9 × 10.5 × 10.5 ft
- Area
- 292.8 sq ft · 27.2 m²

E8 (with Balcony)
- Size
- 37.7 × 10.5 × 10.5 ft
- Area
- 396.1 sq ft · 36.8 m²

E8 (without Balcony)
- Size
- 37.7 × 10.5 × 10.5 ft
- Area
- 396.1 sq ft · 36.8 m²

D8
- Size
- 45.9 × 11.2 × 10.5 ft + 29.5 × 9.8 × 8.2 ft
- Area
- 803 sq ft · 74.6 m²
Specifications are based on current product records and remain subject to project-specific engineering, selected configuration, transportation planning and local approval.
How a project runs
The land decides the house. Six stages, in order.
A successful modular project begins with the parcel, the intended use and a realistic delivery path — not with a product photograph. Each stage is documented before the next begins.
Site brief
Start with the land.
The parcel, access, intended use, occupancy, preferred model, schedule and budget framework. Everything that follows is checked against this document.
Model and layout
Select the base system.
Starting model, floor plan, openings, finishes, equipment and the shipping configuration they imply.
Site and compliance
Identify requirements early.
Zoning, foundation inputs, utilities, structural criteria and the local review pathway — with the professionals and authorities who will sign it off.
Engineering and production
Document before fabrication.
Confirmed selections, drawings, production scheduling, factory fabrication and quality-control records, each written to the project record as it happens.
Freight and delivery
Plan beyond the port.
Export packing, ocean freight, customs, inland transportation and site access, planned against the parcel from stage one.
Installation support
Prepare the local handoff.
Module placement, connection and technical handover information for the contractor and installation team.
Controlled production
Build with documented decisions.
Confirmed selections, technical information and production requirements are settled before fabrication. Inspection and quality-control records are organised for project review, not promised afterwards.
Wind criteria, foundation conditions, utilities, access and code pathways differ by location. The product must fit the parcel; that is why stage three comes before stage four.
What we are, and are not
A bridge between factory and site.
Bionpact does not own the factory. It runs the order — product selection, technical communication, production coordination, export logistics and project handoff — around a defined site and intended use, and it keeps the record.
Our manufacturing partner brings twenty-seven years of production history, eighteen or more patents and qualification documents, thirty-four or more material certifications and eighty or more honours and certificates . Those are its credentials, not ours; supporting documents are available for qualified project review.
Bionpact does not represent that every model is automatically approved for every parcel. Permitting, engineering, foundation design and installation responsibilities must be confirmed for the project location. Final responsibilities and costs are defined for each project.
Stage one
Tell us about the land.
The parcel, what you want it to do, the model you are drawn to, and anything you already know about zoning, wind or access. You do not need every answer. We will tell you what has to be true for it to work.

