BionpactBIONPACT

A home built in a factory, delivered to your land with its full record.

Modular homes, delivered to your land, on the record from the first quotation to the last payment. The hardest product to move is the one we chose to prove it with.

Apple Cabin system — residential configuration
Apple Cabin system — residential configuration

What you are buying

Three things arrive with every Bionpact home.

The house. Built in a factory to a tolerance no site crew can match, from documented configurations with inspection records behind them. Eleven models across two systems: Apple Cabin for living, Capsule House for staying.

The delivery. Export packing, ocean freight, customs, inland haulage and the technical handoff to your local contractor — planned around your parcel before anything is built, not after it lands at the port.

The record. Every handoff signed as it happens: which line, which inspector, which date, which freight leg. You can read it. Your lender, insurer or county can read it. It cannot be edited after the fact.

Eleven models · two systems

For living, and for staying.

Apple Cabin for residences, ADUs, guest accommodation and workforce housing. Capsule House for resorts, boutique hotels and premium short-term stays, where the exterior is the brand and the view is the room.

A1 (5.6m)
Apple Cabin

A1 (5.6m)

Compact one-bedroom
Size
18.4 × 7.4 × 8.0 ft
Area
135.6 sq ft · 12.6 m²
A1 (11.5m)
Apple Cabin

A1 (11.5m)

Extended one-bedroom
Size
37.7 × 7.4 × 8.0 ft
Area
278.8 sq ft · 25.9 m²
D1
Apple Cabin

D1

Two-storey combination
Size
37.7 × 14.8 × 7.9 ft + 37.7 × 7.4 × 8.0 ft
Area
836.4 sq ft · 77.7 m²
A2
Apple Cabin

A2

Wide-body one-bedroom
Size
37.7 × 9.8 × 9.8 ft
Area
371.4 sq ft · 34.5 m²
A3
Apple Cabin

A3

Wide-body multi-room
Size
37.7 × 24.9 × 9.8 ft
Area
947.2 sq ft · 88 m²
E3
Capsule House

E3

Compact studio
Size
18.4 × 10.5 × 10.5 ft
Area
192.9 sq ft · 17.9 m²
E5
Capsule House

E5

Compact panorama suite
Size
27.9 × 10.5 × 10.5 ft
Area
292.8 sq ft · 27.2 m²
E6
Capsule House

E6

Balcony panorama suite
Size
27.9 × 10.5 × 10.5 ft
Area
292.8 sq ft · 27.2 m²
E8 (with Balcony)
Capsule House

E8 (with Balcony)

Large panorama suite with balcony
Size
37.7 × 10.5 × 10.5 ft
Area
396.1 sq ft · 36.8 m²
E8 (without Balcony)
Capsule House

E8 (without Balcony)

Large panorama suite
Size
37.7 × 10.5 × 10.5 ft
Area
396.1 sq ft · 36.8 m²
D8
Capsule House

D8

Double-deck suite
Size
45.9 × 11.2 × 10.5 ft + 29.5 × 9.8 × 8.2 ft
Area
803 sq ft · 74.6 m²

Specifications are based on current product records and remain subject to project-specific engineering, selected configuration, transportation planning and local approval.

How a project runs

The land decides the house. Six stages, in order.

A successful modular project begins with the parcel, the intended use and a realistic delivery path — not with a product photograph. Each stage is documented before the next begins.

  1. Site brief

    Start with the land.

    The parcel, access, intended use, occupancy, preferred model, schedule and budget framework. Everything that follows is checked against this document.

  2. Model and layout

    Select the base system.

    Starting model, floor plan, openings, finishes, equipment and the shipping configuration they imply.

  3. Site and compliance

    Identify requirements early.

    Zoning, foundation inputs, utilities, structural criteria and the local review pathway — with the professionals and authorities who will sign it off.

  4. Engineering and production

    Document before fabrication.

    Confirmed selections, drawings, production scheduling, factory fabrication and quality-control records, each written to the project record as it happens.

  5. Freight and delivery

    Plan beyond the port.

    Export packing, ocean freight, customs, inland transportation and site access, planned against the parcel from stage one.

  6. Installation support

    Prepare the local handoff.

    Module placement, connection and technical handover information for the contractor and installation team.

Exploded view of a module: frame, panels, insulation, finishes
What a module is made of. Every layer carries its own entry in the record.

Controlled production

Build with documented decisions.

Confirmed selections, technical information and production requirements are settled before fabrication. Inspection and quality-control records are organised for project review, not promised afterwards.

Wind criteria, foundation conditions, utilities, access and code pathways differ by location. The product must fit the parcel; that is why stage three comes before stage four.

Modules in production at the factory
Our manufacturing partner's production floor

What we are, and are not

A bridge between factory and site.

Bionpact does not own the factory. It runs the order — product selection, technical communication, production coordination, export logistics and project handoff — around a defined site and intended use, and it keeps the record.

Our manufacturing partner brings twenty-seven years of production history, eighteen or more patents and qualification documents, thirty-four or more material certifications and eighty or more honours and certificates . Those are its credentials, not ours; supporting documents are available for qualified project review.

Bionpact does not represent that every model is automatically approved for every parcel. Permitting, engineering, foundation design and installation responsibilities must be confirmed for the project location. Final responsibilities and costs are defined for each project.

Stage one

Tell us about the land.

The parcel, what you want it to do, the model you are drawn to, and anything you already know about zoning, wind or access. You do not need every answer. We will tell you what has to be true for it to work.